Skip to main content
CallTower Solutions Center

Circuit Test and Turn-Up Requirements

Circuit Test and Turn-Up Requirements

Requirements

  • Knowledge of where the circuit has been installed
  • Placement of the router must be within reach of the new circuit and a power outlet.
  • Ethernet Cable long enough to connect the router and circuit jack together
  • PC with serial port (DB-9) or Serial to USB adapter in close proximity to the router and circuit.
  • Internet access to the PC, independent of the circuit.
  • A Console Cable. This should have been shipped with the equipment. Confirm prior to Test and Turn-up date.
  • Was this article helpful?